Closure of Evergreen Lane in Milford

101

deldotAt 7 a.m. on Tuesday, September 3 continuing through Friday, October 18, pending weather, replacement of Bridge over Haven Lake on Evergreen Lane between Old Shawnee Road and Meadow Brook Lane in Milford will require the Closure of Evergreen Lane in Milford. DelDOT’s contractor, A-Del Construction Company, will be replacing the bridge structure. This project involves the replacement of the existing corrugated metal pipes with three reinforced concrete pipes. Additional work includes minor reconstruction of the roadway approach, installation of guardrail as needed, and placement of riprap in the stream to prevent erosion.

Message signs will be in place to advise motorists of the upcoming closure and detour.

Detour Route:

Meadow Brook Lane to Old Shawnee Road and return to Evergreen Lane or Old Shawnee Road to Meadow Brook Lane and back to Evergreen Lane